Case Study

London Security Upgrade – LPS 1175 SR2 Steel Doors

London

Overview

We were appointed to deliver a security upgrade for a commercial facility in London, supplying and installing multiple LPS 1175 SR2 certified steel security door sets.

Security Solution

The objective was to improve resistance to forced entry while maintaining a professional appearance and minimising disruption to day-to-day operations. The installed doors featured heavy-duty steel frames, high-security locking systems, durable powder-coated finishes and weather-sealed installation.

Survey & Installation

A detailed survey verified dimensions, structural conditions and access requirements. Our team then coordinated manufacture and completed installation in planned phases, including frame fixing, door adjustment, high-security hardware, perimeter sealing and operational testing.

Project Outcome

The completed installation replaced older entrances with independently certified LPS 1175 SR2 steel security doorsets, providing a robust, long-lasting security upgrade delivered safely and with minimal disruption.

Project Gallery

Installation Images